Project gallery

Site photographs from delivered work

Documentation photographs taken on site by our engineers during and after the works. Grouped by service line; every busbar reference is closed with measured values and a completion certificate.

DC fast charging

From Kahramaa approval to energisation

DC charging sites where we obtained the approvals, installed the meter and energised the chargers.

Ezdan Palace Hotel — 60 kW DC, Doha60 kW DC
Ezdan Palace HotelDoha

Branded DC fast-charging canopy

  • End-to-end infrastructure
  • Electrical & civil installation
  • Approvals
  • Meter installation
  • Energisation
Olympic Tower — 2 × 60 kW DC, Dafna2 × 60 kW DC
Olympic TowerDafna

Dual-outlet DC fast charger

  • Installation
  • Approvals
  • Meter installation
  • Energisation
Al Hazm Mall — 2 × 30 kW DC, Doha2 × 30 kW DC
Al Hazm MallDoha

Basement car-park DC chargers

  • Approvals
  • Meter installation
  • Energisation
Toyota Showroom — 180 kW DC, Lusail180 kW DC
Toyota ShowroomLusail

Showroom forecourt DC chargers

  • Approvals
  • Meter installation
  • Energisation
AC & public charging

Government, hospitality and public charging bays

Ministry of Municipality, Al Wakra — 22 kW dual-socket AC · supply, testing and commissioning
Ministry of Municipality, Al Wakra — 22 kW dual-socket AC · supply, testing and commissioning
Public AC charging bays with EV parking signage — Doha
Public AC charging bays with EV parking signage — Doha
Showroom charging pedestal
Showroom charging pedestal
Ezdan Palace Hotel — branded AC charging pedestal
Ezdan Palace Hotel — branded AC charging pedestal
Covered private parking — pedestal charger
Covered private parking — pedestal charger
Covered private parking — pedestal charger
Covered private parking — pedestal charger
Busbar systems

250+ supply, maintenance and installation projects

A selection of sites, not a complete list. Systems of any brand, 800 to 3200 A, in banks, malls, hotels, government towers and residential developments across Doha.

Busbar risers, Doha Festival City Mall
Doha Festival City Mall — busbar risers
Additional tap-off unit, The Eighteen Tower
The Eighteen Tower — additional tap-off unit
Rectification · supplyViva Bahriya Tower 3 — The Pearl1600 A riser: failed joint rectified; straight elements and mono-block joints supplied after factory acceptance testing.
Corrective & preventiveQNB Al-Mathaf Tower1200 A riser: ≈90 °C joint found by thermal inspection; joints and sections re-insulated, riser re-torqued, ≥5 GΩ on Megger.
ModificationDoha Festival City — ShowroomThree risers (1600 / 3200 / 2000 A) re-routed and modified; ≥250 MΩ all phases.
PreventiveAbdullah Abdulghani Commercial TowerRiser-wide rectification of corrosion; tap-off handles and hardware renewed across 23 floors.
RectificationQatari Diyar Building — LusailStraight-section re-insulation; Megger testing and commissioning.
RectificationInterContinental Hotel — DohaStraight-section re-insulation and full insulation tape replacement.
RectificationAl Fardan Building — DohaEnd-cap renewal and joint insulation treatment.
RectificationMall of Qatar — Al RayyanJoint inspection, cleaning and insulation tape replacement.
PreventiveTornado Tower — West BayFull riser preventive maintenance with thermal inspection and Megger testing.
PreventiveWest View Residence (CBQ)Thermal scan, joint inspection, re-torquing and as-left documentation.
PreventiveThe Gate MallThermal imaging, re-torquing, insulation check and tap-off inspection.
ModificationThe Eighteen Tower — LusailAdditional tap-off unit designed, fabricated and commissioned.
ModificationMinistry of Culture Tower — West BayCustom tap-off unit to match the existing specification.
InstallationAl Shahd Tower — West BayRiser installation, alignment correction; Megger check and commissioning.
Home charging

Villa wallbox installations — any brand

Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Villa wallbox installation — Doha
Events

Autonomous e-Mobility Forum — Ministry of Transport, Doha

SIA Echo × EVision team at the forum
SIA Echo × EVision team at the forum
SIA Echo exhibitor stand
SIA Echo exhibitor stand
Teltonika EVC2 wallboxes on display
Teltonika EVC2 wallboxes on display
Partnership meetings during the forum
Partnership meetings during the forum
At the SIA Echo stand
At the SIA Echo stand
Solar-canopied e-bus depot concept exhibited at the forum
Solar-canopied e-bus depot concept exhibited at the forum

Back to EVision & SIA Echo

Online now

Looking for an EV charging or busbar quotation? Talk to an engineer on WhatsApp.